06 · TESTING / VALIDATION

Preparing the Transition from SITL to Hardware

Sequencing bench tests, independent safety checks, and evidence capture before flight validation begins.

Back to development log

PROJECT NOTE

Documentation placeholder

This route is ready for a full engineering note when verified source material, figures, and evidence are available. It intentionally does not invent test results, dates, or hardware performance.

The development log separates completed software, simulation evidence, work in development, and planned physical validation. Future posts can be added through the centralized project content file without restructuring the site.