06 · DEVELOPMENT LOG

Engineering in the open.

A record of what has been built, what has only been simulated, and what still needs physical validation.

ALL ENTRIES / 05
01
COMPLETED

Initial ARES-01 Desktop Release

A stable Windows-native foundation for telemetry, simulation, replay, diagnostics, and technical reporting.

02
COMPLETED

Building a Safety-Gated Simulation Control Layer

Designing explicit local-SITL verification and operator gates before any simulation command can be issued.

03
IN DEVELOPMENT

Designing the Modular Air Vehicle Architecture

Exploring repairable structures, replaceable sections, and payload integration without inventing unvalidated performance claims.

04
PLANNED

Planning the Automated Antenna Tracker

Defining telemetry-to-angle calculations and a future pan-tilt hardware interface.

05
PLANNED

Preparing the Transition from SITL to Hardware

Sequencing bench tests, independent safety checks, and evidence capture before flight validation begins.

PUBLICATION PRINCIPLE

Future dates remain placeholders until work begins. Planned entries do not imply completed tests or validated performance.