06 · FLIGHT COMPUTER / HARDWARE

July 2026 — Rev A schematic closure

69 populated components, clean ERC, exact footprint and MPN coverage, ready for placement review.

Back to development log

VERIFIED MILESTONE

Stage 5C schematic closure

ARES ReFlight Stage 5C hardware milestone showing a blue Rev A flight-computer concept and verified engineering status.
CONCEPT VISUAL — The rendered board is not a manufactured PCB. Stage 5C confirms schematic closure only.

ARES-FC-REV-A-SCH-5C.0 closed with 69 populated components, zero DNP items, zero ERC errors, zero ERC warnings, zero ERC exclusions, complete exact MPN and footprint coverage, and zero symbol-to-pad mismatches.

This remains a bench/HIL prototype and is not flight approved. Stage 6 digital placement is now complete, while routing, manufacturing output, fabrication, and physical validation remain pending.